Behlen Streamlines Factory Flow with 3DEXPERIENCE Works
Due to over 80 years of operations at the massive Columbus factory, the multiple business units have overlapping production lines and processes, resulting in a stockpile of old, new, and custom-made equipment — some still used and some not; various materials; and a variety of furniture, cabinetry, and storage racks. Over the years, each business unit has taken up any available space, contributing to bottlenecks that impede factory flow.
“Our plant layout has become something of a hodgepodge with certain jobs moving back and forth from one end of the building to the other when they could have benefitted from better flow within the factory plant layout,” explains Process Engineer James Kucera. “The ultimate goal is to configure the plant in order to produce better products at lower costs.”