Free Download

Scaling Sustainable Operations with Smarter Engineering

Pacific Recycling Inc. turned to SOLIDWORKS and Hawk Ridge Systems to boost efficiency, reduce downtime, and bring lean manufacturing to life.

In this case study, see how they:

  1. Cut repair costs by 99%

  2. Used simulation to plan safely and reduce risk

  3. Improved maintenance workflows with 3D models

  4. Applied lean thinking to extend equipment life